With the two spacecraft (mostly) assembled, it’s time to carefully review the configuration of the system & ensure that all unit-level, subsystem, and system testing has been completed. Here is where we make sure everything is ready to put the spacecraft through their environmental tests, i.e. the conditions they will face (vibration, acoustic, vacuum, and thermal) during launch and in space.
Categories: